Project Overruns: The Field-Level Insight No One Puts in the RFP

By Glazix | June 6, 2025

The drawings were clean. The shipments were “on time.” So why did the job still overrun?

Project overruns don’t always come from big failures. Often, it’s an accumulation of friction—scope creep, sequencing mismatches, or undocumented install delays—that never shows up in the RFP. But PMs feel it, log it, and adjust their vendor list accordingly.

Field-level contributors to overrun:

Refractory materials that require double the cure time due to site conditions

No install support for substituted glass components with different prep needs

Missed coordination with other trades—causing rework or schedule stalls

Distributors who avoid this trap don’t just ship product. They:

Flag sequence and install risks up front

Recommend job phasing when lead times slip

Capture delays in a format PMs can use to justify change orders or defend schedules

PMs remember the supplier who helped them explain the delay—not the one who caused it.