First-Day Panic Often Starts in the QA Office
A project can derail before the first crate is opened—especially if quality assurance and quality control teams aren’t aligned with job-specific expectations. For glass distributors, ensuring QA/QC alignment is how you protect day-one credibility.
Bridge the Gap Between Drawing and Delivery
QA should confirm product conformance to specs. QC should confirm it matches install conditions. That includes:
Unit orientation per drawing
Edgework finish as required
Coating placement as per elevation
Hardware completeness per sequence
Build QA/QC Into Your Staging Schedule
QA should verify during cutting/assembly. QC should confirm at rack-out and before loading. Share final checklists with the installer as proof of conformity.